141 documents • Swipe sideways on mobile to see all columns.
| GR / Notification No. | Date | Subject / વિષય | Download |
|---|---|---|---|
| EPCD/ELA/e-file/20/2023/1173/k Branch: K | 17-07-2026 | ટ્રાન્સમિશન લાઈન/ટ્રાન્સમિશન ટાવર ઊભા કરતી વખતે જમીન/પાક/ફળાવ ઝાડ અને અન્ય વૃક્ષોને થયેલ નુકશાનના વળતર અંગેની સંકલિત અદ્યતન માર્ગદર્શિકા પ્રસિદ્ધ કરવા બાબત. | ↓ Download |
| EPCD/GCR/e-file/20/2023/0309/K Branch: K | 24-12-2025 | Gujarat Pumped Storage Project Policy - 2025 | ↓ Download |
| EPCD/REN/e-file/20/2025/1966/B1 Branch: B1 | 24-12-2025 | Gujarat Integrated Renewable Energy Policy - 2025 | ↓ Download |
| EPCD/SLR/e-file/20/2025/1414/B1 Branch: B1 | 24-12-2025 | Gujarat Green Hydrogen Policy - 2025 | ↓ Download |
| MMH/e-file/20/2022/0001/B1 Branch: B1 | 03-12-2025 | Extension of the Operative Period of the Gujarat Small Hydel Policy - 2016 | ↓ Download |
| EPCD/SLR/e-file/20/2025/0734/B1 Branch: B1 | 06-11-2025 | સ્ટ્રીટ લાઈટિંગ સિસ્ટમમાં ઓપરેશન ટાઈમિંગ ઑટોમાઈઝેશન તેમજ સ્માર્ટ લાઈટિંગ સોલ્યુશન થકી વીજબચત માટેની માર્ગદર્શક સૂચનાઓ | ↓ Download |
| EPCD/SLR/e-file/20/2025/0734/B1 Branch: B1 | 15-10-2025 | વીજળીના સાધનો અને ઓટોમેશન સિસ્ટમના શ્રેષ્ઠ ઉપયોગથી સરકારી ઓફિસો અને મકાનોમાં ઊર્જા બચત અંગે માર્ગદર્શક સૂચનાઓ. | ↓ Download |
| SLR/e-file/20/2022/0365/B1/PF-1 Branch: B1 | 05-08-2025 | PM Surya Ghar: Muft Bijli Yojana | ↓ Download |
| EPCD/SLR/e-file/20/2024/1524/B1 Branch: B1 | 01-08-2025 | Subsidy for BLDC fans for residential electricity consumers in rural areas and 5 star rated pumps for new electricity consumers for agricultural purposes | ↓ Download |
| GUV/2016/3885/K-1 Branch: K1 | 05-05-2025 | To implement a comprehensive policy of providing electricity connections for various purposes outside the rural areas. | ↓ Download |
| EPCD/GUV/e-file/20/2025/0530/K-1 Branch: K-1 | 19-04-2025 | Regarding rules of Change in Name of Electric Connection | ↓ Download |
| EPCD/GUV/e-file/20/2025/0575/K-1 Branch: K-1 | 03-04-2025 | To re-consider Circular Dated:24-10-2023 regarding Rules of Permanent disconnection, Re-connection, Shifting, Change of Circumstances | ↓ Download |
| EPCD/BUG/e-file/20/2024/2053/K-1 Branch: K-1 | 21-03-2025 | સાગરખેડુ સર્વાંગી વિકાસ યોજના અંતર્ગત 11 કે.વી. મિડિયમ વૉલ્ટેજ કવર્ડ કન્ડક્ટર (MVCC) નો ઉપયોગ કરવા બાબત. | ↓ Download |
| EPCD/BUG/e-file/20/2024/2053/K-1 Branch: K-1 | 21-03-2025 | To Use 11 KV Medium Voltage Coverd Conductor in SagarKhdu Sarvangi Vikas Yojana | ↓ Download |
| GR No.EPCD/2025/0118/K1 Branch: k1 | 06-02-2025 | To Change Norms of Kutir Jyoti Scheme under Tribal Area Subplan | ↓ Download |
| SLR/e-file/20/2022/0365/B1 Section-PF2 Branch: B1 | 28-01-2025 | Appointment of State Implementing Agency (SIA) under PM Surya Ghar: Muft Bijli Yojana (PMSG: MBY) | ↓ Download |
| SLR/e-file/20/2022/0362/B1 Branch: B1 | 18-12-2024 | Scheme for Decentralized Ground/Stilt Mounted Grid Connected Solar or other Renewable Energy based Power Plants under Component-A of PMKUSUM Scheme | ↓ Download |
| GET-11-2015-GOI-199-K Branch: K | 02-12-2024 | Amendment dated 02-12-2024 - Regarding Framing Of Guidelines Regarding Compensation For Loss Of Land/Crops/Plants/Trees During Construction Of Transmission Line/Transmission Tower | ↓ Download |
| G.R. No. : GET-11-2015-GOI-199-K Branch: K | 14-10-2024 | Amendment dated 14-10-2024 - Regarding Framing Of Guidelines Regarding Compensation For Loss Of Land/Crops/Plants/Trees During Construction Of Transmission Line/Transmission Tower | ↓ Download |
| EPCD/BESS/e-file/20/2024/0223/B1 Branch: B1 | 27-03-2024 | Appointment of State Nodal Agency for Battery Energy Storage System and other emerging technology | ↓ Download |
| G.R. No. : GET-11-2015-GOI-199-K Branch: K | 01-03-2024 | Regarding Framing Of Guidelines Regarding Compensation For Loss Of Land/Crops/Plants/Trees During Construction Of Transmission Line/Transmission Tower | ↓ Download |
| null Branch: null | 25-08-2023 | Regarding framing of guidelines regarding compensation for loss of land/crops/plants/trees during construction of transmission line/transmission tower | ↓ Download |
| GR.GET-11-2015-GOI-199-K Branch: k | 25-08-2023 | Regarding framing of guidelines regarding compensation for loss of land/crops/plants/trees during construction of transmission line/transmission tower | ↓ Download |
| GR.EPCD/BUG/e-file/20/2023/0088/K1 Branch: k1 | 25-05-2023 | Provision of Revamped Distribution Sector Scheme. | ↓ Download |
| GR No. : GUV-122020-345-K.1 Branch: K1 | 23-05-2023 | The issue of providing relief in electricity bills to electricity consumers in the extraordinary situation caused by Corona Virus (Covid-19). | ↓ Download |
| G.R.No.WSH/E-File/20/2022/1072/B1-PF1 Branch: B1 | 17-04-2023 | Amendment In Gujarat Wind-SOlar Hybrid Power Policy-2018 | ↓ Download |
| GR. No. : SLR/E-File/20/2022/1091/B1 Branch: B1 | 17-04-2023 | Issue of an amendment resolution regarding the scheme of providing stand alone off grid solar powered irrigation pump sets under Component-B of the Pradhan Mantri Kisan Urja Suraksha Avum Utthan Mahabhiyan (PM-KUSUM) scheme in the state. | ↓ Download |
| G.R. No. WND/E-File/20/2022/0527/B1 Branch: B1 | 31-03-2023 | Extension Of The Operative Period Of The Gujarat Wind Power Policy-2016 | ↓ Download |
| G.R.No.SLR/11/2018/1602/B1 Branch: B1 | 02-11-2022 | Amendment: Desalination Plants Within Integrated Power Generation Units In The State Of Gujarat | ↓ Download |
| G.R.No. WTE/11/2022/1316/B1 Branch: B1 | 02-11-2022 | GUJARAT WASTE TO ENERGY POLICY - 2022 | ↓ Download |
| G. R. No: MMH/11/2015/1342(P-1)/B1 Branch: B1 | 21-10-2022 | Extension Of The Operative Period Of The Gujarat Small Hydel Policy-2016 | ↓ Download |
| G. R. No: SLR/11/2016/164/B1 Branch: B1 | 21-10-2022 | Extension Of The Operative Period Of The Gujarat Wind Power Policy-2016 | ↓ Download |
| G. R. No: MMH/11/2015/1342(P-1)/B1 Branch: B1 | 21-10-2022 | Extension Of The Operative Period Of The Gujarat Small Hydel Policy-2016 | ↓ Download |
| G.R.No.SLR-11/2015/401/B1 Branch: B1 | 28-09-2022 | Amendment In SURYA-Gujarat (Surya Urja Rooftop Yojana-Gujarat | ↓ Download |
| G. R. No: SLR/11/2018/268(P-2)/B1 Branch: B1 | 28-09-2022 | GUIDELINES FOR INVITATION OF APPLICATIONS FOR DISBURSEMENT OF CAPITAL SUBSIDY UNDER GUJARAT ELECTRIC VEHICLE POLICY-2021 FOR EV CHARGING INFRASTRUCTURE (EVCI) | ↓ Download |
| G.R. No.SLR/11/2016/1790/B1 Branch: B1 | 29-08-2022 | SURYA GUJARAT Surya Urja Rooftop Yojana Gujarat | ↓ Download |
| GR. No. : SLR/11/2014/Gol/1154/B1 Branch: B1 | 08-07-2022 | Scheme to connect solar system to grid to provide traditional electricity connection to farmers with off-grid solar pumps completed five years. | ↓ Download |
| G.R.: SLR/11/2019/51/B1 Branch: B1 | 08-06-2022 | POLICY FOR DEVELOPMENT OF SMALL SCALE DISTRIBUTED SOLAR PROJECTS 2019: ADDENDUM | ↓ Download |
| G.R.No. MMH/11/2015/1342/B Branch: B1 | 13-04-2022 | Extension Of The Operative Period Of The Gujarat Small Hydel Policy - 2016 | ↓ Download |
| G.R.No. REN/11/2015/1343/B1 Branch: B1 | 13-04-2022 | Extension Of The Operative Period Of The Gujarat Waste To Energy Policy - 2016 | ↓ Download |
| G.R.No. SLR/11/2016/164/B1 Branch: B1 | 13-04-2022 | Extension Of The Operative Period Of The Gujarat Wind Power Policy-2016 | ↓ Download |
| G.R. No. : GET-11-2015-GOI-199-K Branch: K | 03-12-2021 | Regarding the amendment of guidelines regarding compensation for loss of land/crops/fruits/trees during construction of transmission line/transmission tower | ↓ Download |
| GR.No : SLR/11/2020/1144/B1 Branch: B1 | 16-11-2021 | Issue of an amendment resolution regarding the scheme of providing Stand Alone Off Grid Solar Energy Powered Irrigation Pump Sets under Component-B of the Prime Minister Kisan Urja Suraksha Avum Utthan Mahabhiyan (PM-KUSUM) Scheme in the State. | ↓ Download |
| GR.No.: REN/11/2021/1753/B1 Branch: B1 | 25-10-2021 | Issue of an amendment resolution regarding the scheme of providing stand alone off-grid solar powered irrigation pump sets under Component-B of the Prime Minister Kisan Urja Suraksha Avum Utthan Mahabhiyan (PM-KUSUM) Scheme in the State. | ↓ Download |
| null Branch: Regarding framing of guidelines regarding compensation for loss of land/crops/plants/trees during construction of transmission line/transmission tower | 20-09-2021 | Regarding framing of guidelines regarding compensation for loss of land/crops/plants/trees during construction of transmission line/transmission tower | ↓ Download |
| GR.GET-11-2015-GoI-199-K Branch: k | 20-09-2021 | Regarding framing of guidelines regarding compensation for loss of land/crops/plants/trees during construction of transmission line/transmission tower | ↓ Download |
| GR No. : SAILS.-2012-2548-K1 Branch: K1 | 22-08-2021 | Regarding the release of out-of-turn power connections to applicants who guarantee cultivation of fodder for cattle in scarcity-prone areas in the state. | ↓ Download |
| GR No. : GUV-10-2010-3596-K-1 Branch: K1 | 14-08-2021 | Regarding waiver of lawyer fee and court stamp fee in cases filed in court among the cases included in the "Amnesty Scheme". | ↓ Download |
| G.R. No.SLR/11/2021/486/B1 Branch: B1 | 02-08-2021 | Extension Of The Operative Period Of The Gujarat Wind Power Ploicy- 2016 | ↓ Download |
| GR No. : GUV-132020-1293-.K1 Branch: K1 | 02-07-2021 | Regarding exemption for one year from paying fixed-charge in electricity bill to hotels, resorts, restaurants, waterparks, cinemas-multiplexes, gymnasiums. | ↓ Download |
| G.R.No.REN/11/2021/WG/B1 Branch: B1 | 28-06-2021 | Extension Of The Operative Period Of The Gujarat Small Hydel Policy-2016 | ↓ Download |
| G.R.No.REN/11/2021/WG/B1 Branch: B1 | 28-06-2021 | Extension Of The Operative Period Of The Gujarat Waste To Energy Policy-2016 | ↓ Download |
| G. R. No: SLR/E-File/20/2022/0362/B1 Branch: B1 | 30-01-2021 | Amendments In The Scheme For Decentralized Ground/Stilt Mounted Grid Connected Solar Or Other Renewable Energy Based Power Plants Under Component-A Of PM-KUSUM Scheme | ↓ Download |
| G. R. No.: SLR/11/2020Mini-185/B1 Branch: B1 | 11-12-2020 | Scheme for Decentralized Ground/Stilt Mounted Grid Connected Solar or other Renewable Energy based Power Plants under Component A of PM-KUSUM Scheme | ↓ Download |
| GR No. : SLR/11/2020/851/B1 Branch: B1 | 06-11-2020 | Scheme matter regarding solarisation of grid connected Agriculture pumps under Component-C of Pradhan Mantri Kisan Urja Suraksha Avum Utthan Mahabhiyan (PM-KUSUM) Scheme in the State. | ↓ Download |
| GR.No. : SLR/11/2015/2442/B1 Branch: B1 | 01-09-2020 | Amendments In GUJARAT SOLAR POWER POLICY-2015(For MSME Manufacturing Enterprises) | ↓ Download |
| G. R. No: SLR-11-2015-2442-B1 Branch: B1 | 09-07-2020 | Extension Of The Operative Period Of The Gujarat Solar Power Policy-2015G. R. No: SLR-11-2015-2442-B1 | ↓ Download |
| GR No. : GUV-132020-960(1)-K.1 Branch: K1 | 22-06-2020 | Regarding relief to electricity consumers having LT electricity connection under "Gujarat Atmanirbhar Package". | ↓ Download |
| GR No. : GUV-132020-960-K.1 Branch: K1 | 22-06-2020 | Regarding providing relief in electricity bills to residential electricity consumers under "Gujarat Atmanirbhar Package". | ↓ Download |
| GR No. : GUV-132020-960(2)-K.1 Branch: K1 | 17-06-2020 | Regarding relief to electricity consumers having HT electricity connection under "Gujarat Self-sufficient Package". | ↓ Download |
| GR No. : GUV-132020-960(3)-K.1 Branch: K1 | 17-06-2020 | Regarding relaxation of temporary power connections given for government works under "Gujarat Atmanirbhar Package". | ↓ Download |
| GR.No.: BJT/2014/1447/B Branch: B1 | 06-06-2020 | Regarding the amendment in the resolution of the scheme for providing solar powered irrigation pump sets to the farmers in the state. | ↓ Download |
| GR No. : GUV-122020-345-K.1 Branch: K1 | 11-05-2020 | The matter of providing relief in the extraordinary electricity bill arising due to Corona Virus (Covid-19). | ↓ Download |
| GR No. : GUV-122020-345-K.1 Branch: K1 | 30-03-2020 | In the matter of providing relief in electricity bills to electricity consumers in the extraordinary situation arising due to Corona virus (Covid-19). | ↓ Download |
| GR No.: GUV/122020/345/K-1 Branch: K1 | 27-03-2020 | The issue of providing relief in electricity bills to electricity consumers due to the emergency situation caused by Corona virus (Covid-19). | ↓ Download |
| G.R.No. SLR/11/2019/51/B1 Branch: B1 | 15-11-2019 | GUIDELINES FOR IMPLEMENTATION OF POLICY FOR DEVELOPMENT OF SMALL SCALE DISTRIBUTED SOLAR PROJECTS-2019 | ↓ Download |
| G.R.No. SLR-11/2015/2442/B1 Branch: B1 | 26-09-2019 | Amendments In GUJARAT SOLAR POWER POLICY-2015 (For MSME Manufacturing Enterprises) | ↓ Download |
| G.R.No. SLR-11/2015/2442/B1 Branch: B1 | 26-09-2019 | Amendments In GUJARAT SOLAR POWER POLICY-2015 (For MSME Manufacturing Enterprises) | ↓ Download |
| GR.No. SLR - 11/2015/2442/B1 Branch: B1 | 26-09-2019 | For MSME Manufacturing Enterprises Amendment to Gujarat Solar Energy Policy-2015 | ↓ Download |
| G.R. No.SLR-11/2015/401/B1 Branch: B1 | 05-08-2019 | SURYA GUJARAT (Surya Urja Rooftop Yojana Gujarat) | ↓ Download |
| G.R. NO. SLR/11/2019/51/B1 Branch: B1 | 06-03-2019 | POLICY FOR DEVELOPMENT SMALL SCALE DISTRIBUTED SOLAR PROJECTS - 2019 | ↓ Download |
| GR No. : GUV-2016-3170-K.1 Branch: K1 | 19-02-2019 | One Time Waiver Scheme-2017 for recovery of arrears of consumers/non-consumers with permanently disconnected electricity connections of the State. | ↓ Download |
| GR No. : ELC/2012/773/K1 Branch: k1 | 04-12-2018 | Provision of Agriculture Electricity Connection in Darkzone Area. | ↓ Download |
| GR No. : GUV-2016-3170-K1 Branch: K1 | 18-10-2018 | MAFI SCHEME-2017 for recovery of dues of permanently disconnected customers/non-customers of the state | ↓ Download |
| GR No.:GUV-2016-3170-K1 Branch: K1 | 03-10-2018 | MAFI SCHEME-2017 for recovery of arrears of consumers/non-consumers with permanently closed electricity connections of the State | ↓ Download |
| GR No.:GUV-2016-3170-K1 Branch: K1 | 01-10-2018 | "MAFI SCHEME-2017" for recovery of arrears of consumers/non-consumers with permanently closed electricity connections of the State | ↓ Download |
| GR.No : SLR/11/2016/2284/B1 Branch: B1 | 29-09-2018 | Issue of Amendment Resolution regarding "Sky Yojana" (Suryashakti Kisan Yojana) in the State | ↓ Download |
| GR No. : GUV-2016-3885-K1 Branch: K1 | 05-07-2018 | To implement a comprehensive policy of providing electricity connections for various purposes outside the rural areas | ↓ Download |
| GR.No: SLR/11/2016/2284/B1 Branch: B1 | 27-06-2018 | Regarding the announcement of "SKY Yojana" (Suryashakti Kisan Yojana) in the State | ↓ Download |
| G.R.No. SLR/11/2017/141/B1 Branch: B1 | 20-06-2018 | GUJARAT WIND- SOLAR HYBRID POWER POLICY - 2018 | ↓ Download |
| G. R. NO.: SLR-11-2015-1200-B1 Branch: B1 | 21-05-2018 | GUJARAT REPOWERING OF THE WIND PROJECTS POLICY - 2018 | ↓ Download |
| GR No. : GUV-2016-3170-K1 Branch: K1 | 09-05-2018 | "MAFI SCHEME-2017" for recovery of arrears of consumers/non-consumers with permanently closed electricity connections of the State | ↓ Download |
| G.R.No.REN-11-2015-1343-B1 Branch: B1 | 01-05-2018 | Amendment Of Gujarat Waste To Energy Policy-2016 | ↓ Download |
| G.R.No. REN-11-2015-1343-B1 Branch: B1 | 01-05-2018 | Modalities For Disbursement Of Differential Amount To Waste To Energy Projects | ↓ Download |
| GR No. : GUV-2016-3170-K1 Branch: K1 | 25-04-2018 | "MAFI SCHEME-2017" for recovery of arrears of consumers/non-consumers with permanently closed electricity connections of the State | ↓ Download |
| GR No.: RES/1094/4403/K1 Branch: K1 | 06-02-2018 | Regarding raising the income limit of the beneficiary for the eligibility of State Government's "Hut Electrification Yojana" and "Kutir Jyoti Yojana". | ↓ Download |
| GR No. : GUV-2016-3170-K1 Branch: K1 | 12-12-2017 | "Mafhi Yojana-2017" for recovery of dues of consumers/non-consumers with permanently closed electricity connections of the State. | ↓ Download |
| GR. GUV/132017/2342/K1 Branch: k1 | 31-08-2017 | Provision of Lift Irrigation from Surface Area (River,Canal & Dam). | ↓ Download |
| GR.No : SLR/11/2015/2442/B Branch: B1 | 21-08-2017 | Amendment to Solar Power Policy, 2015 and Wind Power Policy, 2016. | ↓ Download |
| G.R. No. : GET-11-2015-GOI-199-K Branch: K | 14-08-2017 | Regarding framing of guidelines regarding compensation for loss of land/crops/plants/trees during construction of transmission line/transmission tower | ↓ Download |
| GR No.: GUV/2017/1025/K-1 Branch: K1 | 17-05-2017 | Implementation of Agricultural Voluntary Disclosure Scheme 2017 for regulating excess power load in agricultural electricity connection. | ↓ Download |
| GR.GUV/2016/3819/K1 Branch: null | 03-05-2017 | Provision of Sardar Krushi Jyoti Yojana | ↓ Download |
| GR No.:GUV-2017-1025-K-1 Branch: K1 | 01-05-2017 | Implementation of Agricultural Voluntary Advertisement Scheme 2017 for regulating the power load of agricultural electricity connection | ↓ Download |
| G.R.No.SLR/11/2015/401/B Branch: B1 | 13-04-2017 | Amendment In The Provisions Related To Installation Of Residential Rooftop Solar Plants | ↓ Download |
| GR.No.: BJT/2014/1447/B Branch: B1 | 10-02-2017 | Regarding the amendment in the resolution of the scheme for providing solar powered irrigation pump sets to the farmers in the state. | ↓ Download |
| GR No.: GUV/2016/3885/K-1 Branch: K1 | 24-01-2017 | To implement a comprehensive policy of providing electricity connections for various purposes outside the rural areas. | ↓ Download |
| Circular No. : GUV-2016-3442-K1 Branch: K1 | 30-12-2016 | Regarding providing agricultural power connection on priority basis to the farmers of transmission line poles/towers of pressure above 66 KV which are to be erected in agricultural land. | ↓ Download |
| GR.GUV/2016/3819/K1 Branch: k1 | 18-10-2016 | Provision of Second Agriculture Connection in Same Land. | ↓ Download |
| GR.GUV/2016/2538/K1 Branch: k1 | 18-10-2016 | Provision of Second Motor Connection in Same Land. | ↓ Download |
| Circular No. : SLR/11/2016/1450/B Branch: B1 | 09-08-2016 | Under the "Ujala Gujarat" project, all government offices/buildings in the state will be fitted with LED bulbs. A matter of consuming the bulb. | ↓ Download |
| G.R.No. SLR-11-2016-164-B Branch: B1 | 02-08-2016 | GUJARAT WIND POWER POLICY - 2016 | ↓ Download |
| G.R.No : SLR/11/2015/1273/B Branch: B1 | 24-06-2016 | Subsidy For LED Bulbs To The Domestic Consumers Under "UJALA GUJARAT" | ↓ Download |
| GR.No.: BJT/2014/1447/B Branch: B1 | 27-05-2016 | Regarding the amendment in the resolution of the scheme for providing solar powered irrigation pump sets to the farmers in the state. | ↓ Download |
| G.R.No. EDA-102001-3054-B Branch: B1 | 25-05-2016 | Wind Power Policy - 2013 | ↓ Download |
| G.R.No : SLR/11/2015/1273/B Branch: B1 | 23-05-2016 | Subsidy For LED Bulbs To The Domestic Consumers Under "UJALA GUJARAT" | ↓ Download |
| G.R.No. SLR-11/2015/401/B Branch: B1 | 31-03-2016 | Subsidy For Residential Rooftop Solar Plants. | ↓ Download |
| GR.BJT/2015/4675/K1 Branch: k1 | 31-03-2016 | Provision of Agricultural Electricity Connections for Tribel Area Farmers. | ↓ Download |
| Circular No.SLR/11/2016/70/B Branch: B1 | 18-02-2016 | Prescribing Time Line For Speedier Installation Of Rooftop Solar Plants. | ↓ Download |
| GR.No.: BJT/2014/1447/B Branch: B1 | 19-08-2015 | Regarding the amendment in the resolution of the scheme for providing solar powered irrigation pump sets to the farmers in the state. | ↓ Download |
| GR.No: ADT-102015-715-B Branch: B1 | 11-08-2015 | Matter of constitution of Audit Committee. | ↓ Download |
| GR No.: RES/1094/4403/K1 Branch: K1 | 07-08-2015 | Matter of Integrated Resolution of "Shack Electrification Scheme" of State Government | ↓ Download |
| GR No.: GUV/2015/599/K1 Branch: K1 | 17-06-2015 | Scheme for shifting/shifting of power poles and power distribution lines in Municipal/Municipal areas | ↓ Download |
| Govt. GR No.: GUV-2015-Gol.47-K1 Branch: K1 | 06-06-2015 | Constitution Of "District Electricity Committees" Under Deen Dayal Upadhyaya Gram Jyoti Yojana (DDUGHY) And Integrated Power Development Scheme (IPDS) | ↓ Download |
| GR No.: RES/1094/4403(6)/K1 Branch: K1 | 20-05-2015 | Regarding raising the income limit of the beneficiary for the eligibility of State Government's "Hut Electricity Scheme" and "Kutir Jyoti Yojana". | ↓ Download |
| GR No.: RES/1094/4403(6)/K1 Branch: K1 | 20-05-2015 | Regarding raising the income limit of the beneficiary for the eligibility of "Shack Electrification Scheme" and "Cottir Jyoti Scheme" of the State Government. | ↓ Download |
| GR.BJT/2014/3191/K1 Branch: k1 | 09-04-2015 | Provision of Agricultural Electricity Connections for Scheduled Caste Farmers. | ↓ Download |
| GR.No. : BJT-2014-1447-B Branch: B1 | 02-02-2015 | Regarding the amendment in the resolution of the scheme for providing solar powered irrigation pump sets to the farmers in the state. | ↓ Download |
| GR No.: Budget-2012-2548-K1 Branch: K1 | 26-11-2014 | Regarding the scheme to make solar powered irrigation pump sets available to the farmers in the state. | ↓ Download |
| GR No.: Budget-2014-1447-K1 Branch: K1 | 25-09-2014 | Regarding the scheme to make solar powered irrigation pump sets available to the farmers in the state. | ↓ Download |
| Circular No. : TSP/2012/132/K1 Branch: K1 | 05-02-2014 | Timely payment of bi-monthly bills for electricity connection to Scheduled Caste beneficiaries in tribal areas - Non-deduction of electricity connection for outstanding amount of bill collected | ↓ Download |
| GR No.: RES/1094/4403/K-1 Branch: K1 | 18-01-2014 | Regarding non-receipt of token contribution from the beneficiaries of "Shack Electrification Scheme" of the State Government | ↓ Download |
| GR No.: TSP/2012/132/K.1 Branch: K1 | 18-12-2013 | Effective implementation of domestic consumption and sub-well disconnection schemes in tribal areas. | ↓ Download |
| Circular No. : GUV/2013/1152/K1 Branch: K1 | 23-08-2013 | TATKAL SCHEME-2013 For Release Of Agriculture Connection. | ↓ Download |
| G.R. No.EDA-102001-3054-B Branch: B1 | 25-07-2013 | Wind Power Policy- 2013 | ↓ Download |
| GR No.: Budget/10/2003-976-K1 Branch: K1 | 22-08-2012 | "Jyoti Gram Yojana" matter. | ↓ Download |
| GR No.: RES/1094/4403/K1 Branch: K1 | 18-06-2012 | Regarding raising the income limit of the beneficiary for the eligibility of "Shack Electrification Scheme" and "Cottir Jyoti Scheme" of the State Government. | ↓ Download |
| GR No. UGV-102011-70K-1 Branch: K1 | 26-04-2012 | Release Of Electric Connection To Green House Project For Hi-Tech Farming In The Agriculture Land | ↓ Download |
| GR No. GUV/11/2011/4405/K1 Branch: k1 | 13-04-2012 | Provision of Agriculture Electricity Connection in normal category. | ↓ Download |
| GR No. : GUV-10-2010-3596-K.1 Branch: K1 | 29-03-2012 | Regarding the announcement of "Amnesty Scheme" as a one-time relief measure for electricity bill arrears for the purpose of providing electricity connection to all levels of electricity consumers of the state... | ↓ Download |
| G.R.No.SLR/11-2011/491460/B Branch: B1 | 19-07-2011 | Declaration Of Nodel Agency And Project Implementing Agency (PIA) For Development, Implementation And Execution Of Grid Connected Solar Rooftop Programme In Gujarat. | ↓ Download |
| GR.GUV/10/2785/k1 Branch: k1 | 16-07-2010 | Provision to providing Resedential Electric Connection in SCSP Scheme. | ↓ Download |
| GR.No: ECN/11/2009/555891/B Branch: B1 | 11-06-2010 | Scheme to install high-quality (energy efficient) pumps for consumers | ↓ Download |
| GR.BJT/102008/3311/K1 Branch: k1 | 31-03-2009 | Provision of Sardar Khedu Sarvangi Vikas Yojana | ↓ Download |
| null Branch: K1 | 16-07-2008 | Scheme for installation of high quality (Energy Efficient) pumps for agricultural electricity consumers under assistance under Energy Conservation Scheme. | ↓ Download |
| GR No.: RES/2008/2724/K1 Branch: K1 | 12-07-2008 | Matter of amendment in the standard of tribal area sub-plan Hastaki Kutir Jyoti Yojana. | ↓ Download |
| GR No.: RES/1094/4403/K-1 Branch: K1 | 02-07-2008 | To provide electricity facility to families living in slums in any part of the State. | ↓ Download |
| GR No.: Budget/10/2003-976-K1 Branch: K1 | 24-11-2003 | "Jyoti Gram Yojana" | ↓ Download |
| GR No.: Budget/10/2003-976-K1 Branch: K1 | 03-09-2003 | "Jyoti Gram Yojana" New Matter- Matter of giving administrative sanction to Gujarat Vidhut Board of Subsidiary Matter Scheme for the year 2003-04. | ↓ Download |
| Circular No. : Budget/10/2003-976-K1 Branch: K1 | 03-09-2003 | "Jyoti Gram Yojana" New Matter- Matter of giving administrative sanction to Gujarat Vidhut Board of Subsidiary Matter Scheme for the year 2003-04. | Not supplied |
| Circular No.: GUV/2015/599/K1 Branch: K1 | 17-07-2003 | Regarding the inclusion of rural areas in the scheme of shifting/relocating power poles and power distribution lines in Municipalities/Municipalities/Urban Development Corporations. | ↓ Download |
| GR.No : SLR/E-File/20/2022/0020/B1 Branch: B1 | — | Regarding the amendment in the resolution of the plan to connect the solar system to the grid to provide conventional electricity connection to the farmers with off-grid solar pumps after completion of five years. | ↓ Download |
Source: supplied Energy & Petro.xlsx — GR sheet. 141 records.
0 Comments